thank you

Your email has been sent.

Palmetto Coast Industrial Park Longs, SC 29568 25,000 - 178,504 SF of Industrial Space Available






PARK HIGHLIGHTS
- 25,000-217,350 SF - Class "A" Industrial.
- 32' clear high allows for vertical storage.
- Positioned less than five minutes away from 2.2 million SF of retail including Tanger Outlets and Arcadian Shores Commons.
- Uninterrupted access to Highways 31, 22, and 17.
- 44 dock-high loading positions.
PARK FACTS
Total Space Available | 178,504 SF | Park Type | Industrial Park |
Min. Divisible | 25,000 SF |
Total Space Available | 178,504 SF |
Min. Divisible | 25,000 SF |
Park Type | Industrial Park |
ALL AVAILABLE SPACE(1)
Display Rental Rate as
- SPACE
- SIZE
- TERM
- RENTAL RATE
- SPACE USE
- CONDITION
- AVAILABLE
PCIP will continue construction on its third facility (Building 2), which is a 178,504 SF rear-load facility featuring attractive tilt-wall construction, a 32’ minimum clear height, an ESFR sprinkler system, 54’ x 50’ column spacing, up to 50 dock-high loading positions and LED lighting. Building 2 is currently slated to deliver in Q1 2025.
- 50 Loading Docks
Space | Size | Term | Rental Rate | Space Use | Condition | Available |
1st Floor | 25,000-178,504 SF | Negotiable | Upon Request Upon Request Upon Request Upon Request Upon Request Upon Request | Industrial | Shell Space | December 01, 2025 |
Water Tower Rd - 1st Floor
Water Tower Rd - 1st Floor
Size | 25,000-178,504 SF |
Term | Negotiable |
Rental Rate | Upon Request |
Space Use | Industrial |
Condition | Shell Space |
Available | December 01, 2025 |
PCIP will continue construction on its third facility (Building 2), which is a 178,504 SF rear-load facility featuring attractive tilt-wall construction, a 32’ minimum clear height, an ESFR sprinkler system, 54’ x 50’ column spacing, up to 50 dock-high loading positions and LED lighting. Building 2 is currently slated to deliver in Q1 2025.
- 50 Loading Docks
PARK OVERVIEW
Palmetto Coast Industrial Park is Myrtle Beach's first Class "A" industrial park. Located on 69 acres and totaling 718,350 SF across four(4) buildings, this project will provide users with a best-in-class park setting capable of accommodating users from 25,000 SF up to 217,350 SF+. Positioned along Water Tower Road with uninterrupted access to SC Highway 31/Carolina Bays Parkway, Highway 22/Conway Bypass, and US Highway 17, this park provides outstanding connectivity to the entire Myrtle Beach MSA in addition to Wilmington, NC and Charleston, SC. PCIP Building 2 will offer a rear-load facility featuring attractive tilt-wall construction, a 32' minimum clear height, ESFR sprinkler system, 50' X 54' column spacing, up to 44 dock-high loading positions and LED lighting. Building 2 is currently slated to deliver in Q3 2025.
DEMOGRAPHICS
REGIONAL ACCESSIBILITY
Presented by

Palmetto Coast Industrial Park | Longs, SC 29568
Hmm, there seems to have been an error sending your message. Please try again.
Thanks! Your message was sent.